|
|
CARBON STEEL AND STAINLESS STORAGE TANKS
SOME PROJECTS
AGIP
PETROLI SpA Roma GHANA BRANCH FUEL HANDLING FACILITIES
BUIPE/AKOSOMBO
PROJECT: GOIL GHANA
Financing: World Bank
Realization in Ghana, of a fuel transport system via VOLTA lake, by means
of the construction of two depots, inclusive of facilities and equipments
for the loading, unloading, handling and metering of hydrocarboons. Design,
supply and construction of fixed roof storage tanks and storage tank with
inside aluminium floating roof. Design, supply, construction and assembling
of galvanized frames for metering station.
Construction of 6 pipelies 100% X rayed 6 km length, construction and assembling
of internal depot piping, erection of process pump and fire-fighting facilities.
Construction and erection of electrical and instrumental systems, cathodic
protection and leak detector.
Sandblasting, paiting of all the parts of the plant.
Commissioning and start up.
Deposits are in operation since April 1997.
|
 |
 |
| Storage tanks area |
Akosombo depot,
GOIL GHANA |
 |
 |
| Prefabbricated and prepainted sheets
for tanks construction |
Prefabbricated and prepainted sheets
for tanks |

Prefabbricated and prepainted sheets packed for tanks
assembling |
 |
| |
Plates sheets loading |
 |
 |
| Plates sheets transport |
Storage tank roof, Akosombo
depot, GOIL - GHANA |
 |
 |
| Storage tanks area |
Storage tanks area |
ENEA
Design, materials supply, priming and site eraction
at Terranova Bay c/o the ITALIAN RESEARCH BASE
in ANTARCTICA, of one jet double wall storage tank
having 600cm capacity,
according to API 650 code. Welder operators qualified
according API 650 code. Welder operators qualified according
ASMEIX, construction materials ASTM A 516 Gr. 70 and
according to ASTM 312 Tp 304L. Requalified at - 50°C. |
 |
 |
 |
| Storage tank
roof building |
PIANIMPIANTI
SpA
Desing according to API 650 code, supply construction and erection of n.
2 storage tanks c/o STS SpA di Termoli –CB– n.
1 capacity of 2500Mc D=15x14,45 m. and n.1 capacity of 3500Mc D=17,6x14,45
m. |
 |
 |
| Storage tanks area |
Storage roof construction |
|